Monday, May 28, 2007

Site Visit- Form Work


Detail of the pipes and the reo around it and the form work.

Site Visit- Form work


This shows the form work and the reo ready for the concrete to be poured.

Site Visit


Long view of built up ground You can see the plumbing coming out of the ground.

Site Visit


This shows the spray paint on the ground which map out where they have to build the ground up ready for the slab to go on. They have done some already.

Poster Of Major Assignment


Here is my final poster.

Floor Plan



Shows the column layout. Both the warehouse and the show room have 4m spacing between the 'C' section columns.

Finished Model


You can see steel capping on the end of the timber to stop the ends getting wet and rotting.
The guttering only goes on two sides of the showroom roof.
The roofing is colourbond steel.