Monday, May 28, 2007

Geelong Carosel


Shows the underneith of the roof. Steel beams are used to support the roof in-between the main structure. The huge structural beams and columns are counteracting for the glass walls which wouldn't be load bearing.

Geelong Carosel


The detail of the joints show the building is able to move if there is strong winds and effects the building. Being on the shore it would need connections like this because of the strong winds that it would have to stand up to.

Geelong Carosel


A detail of one of the corners. Huge bolts have been used as the main connection style. Steel has been used mostly likely because of the lightness and the easiness to create such a shape as this with the material.

Site Visit- Carosel


The facade of the Geelong Carosel. The structure of the building is completely visible. The skin has a transluscent style to it.

Tilt Up Panels- Hope St and Latrobe Tce


A connection that is ready for beams and the rest of the structure to be attatched. Having these cast into the panels makes it easier to build the rest of the building if the supports are already there.

Tilt Up Panels


A detail of the support bolted to the slab.

Tilt Up Panels


Huge bolt that help hold the two panels together.

Site Visit-Tilt Up Panels


The panels are up and are supported until the rest of the structure is put up so they can stand up on their own.

Site Visit-Tilt Up Panels


You can see the reo and the some form work.

Site Visit-Tilt Up Panels


Shows the tilt up panels in position on site ready to be pulled up and supported in place.

SIte Visit- The Pour



The huge shoot that pumped the concrete out. It appeared from watching the work men this is an easy way of using the shoot compared to the one you manually pull along yourself. Its easier to move and doesnt need so much muscles and manual work. One person can do it on there own.

Site Visit- The Pour


The slab is poured and completed.....

SIte Visit- The Pour


These guys are moving the cement around and flattening out the slab so its al smooth.

Site Visit- The Pour


The workers. One is holding the shoot which the concrete comes out of, another is holding the vibrator which compacts all the wet concrete to get the air out of it.
They started at one end of the building, which is a seperate room to the rest of the building.

Site Visit- Form Work


Detail of the pipes and the reo around it and the form work.

Site Visit- Form work


This shows the form work and the reo ready for the concrete to be poured.

Site Visit


Long view of built up ground You can see the plumbing coming out of the ground.

Site Visit


This shows the spray paint on the ground which map out where they have to build the ground up ready for the slab to go on. They have done some already.

Poster Of Major Assignment


Here is my final poster.

Floor Plan



Shows the column layout. Both the warehouse and the show room have 4m spacing between the 'C' section columns.